Agenda item

(17/05574/FULL1) - 100-102 High Street Penge, London SE20 7HA

Decision:

PERMISSION

 

Minutes:

Description of application – Demolition of the existing building and the erection of a mixed-use development including new post office/shop with ancillary commercial space at ground floor level, together with the provision of 6 flats above.

 

Oral representations in support of the application were received at the meeting.  A submission with photographs had been received from the agent and circulated to Members.

 

Members having considered the report, objections and representations, RESOLVED that PERMISSION be GRANTED AGAINST OFFICERS’ RECOMMENDATIONS. MEMBERS CONSIDERED THAT THE PROPOSED DEVELOPMENT WOULD ENHANCE THE STREET SCENE AND CONSERVATION AREA; IT WOULD PROVIDE QUALITY HOUSING FOR THE AREA, AND WOULD SUPPORT THE SHOPPING CENTRE AND REGENERATE THE EXISTING RETAIL UNITS AND THE HARM IDENTIFIED BY THE OFFICERS’ REPORT TO NUMBERS 96-98 HIGH STREET, PENGE IS OUTWEIGHED BY THOSE BENEFITS,subject to the following conditions and informative:-

“1.The development to which this permission relates must be begun not later than the expiration of 3 years, beginning with the date of this decision notice.

REASON: Section 91, Town and Country Planning Act 1990.

2. The landscaping scheme as shown on the submitted drawings shall be implemented in the first planting season following the first occupation of the buildings or the substantial completion of the development whichever is the sooner.  Any trees or plants which within a period of 5 years from the substantial completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species to those originally planted.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and to secure a visually satisfactory setting for the development.

3. The materials to be used for the external surfaces of the building shall be as set out in the planning application forms and / or drawings unless otherwise agreed in writing by the Local Planning Authority.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the area.

4. Before any part of the development hereby permitted is first occupied boundary enclosures of a height and type to be approved in writing by the Local Planning Authority shall be erected in such positions along the boundaries of the site(s) as shall be approved and shall be permanently retained thereafter.

REASON:  In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of visual amenity and the amenities of adjacent properties.

5. The green flat roof areas of the proposed development shall not be used as a balcony or sitting out area and there shall be no access to the roof area.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the amenities of the adjacent properties. 

6. The proposed privacy screening for the balconies and amenity areas as laid out in the approved plans shall be erected in accordance with the details hereby approved before the first occupation of buildings and shall be permanently retained as such.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the area.

7. Details of the materials to be used for the external surfaces of the building shall be submitted to and approved in writing by the Local Planning Authority before any work is commenced.  The works shall be carried out in accordance with the approved details.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the area.

8. Details of the green walls and green roof areas shall be submitted to and approved in writing by the Local Planning Authority before any work is commenced. The works shall be carried out in accordance with the approved details.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the area.

9. The development hereby permitted shall not be carried out otherwise than in complete accordance with the plans approved under this planning permission unless previously agreed in writing by the Local Planning Authority. 

REASON: In order to comply with Policy BE1 and BE11 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the Conservation Area.

10. Details of a surface water drainage system (including storage facilities where necessary) shall be submitted to and approved in writing by the Local Planning Authority before any part of the development hereby permitted is commenced and the approved system shall be completed before any part of the development hereby permitted is first occupied, and permanently retained thereafter.

REASON:  To ensure satisfactory means of surface water drainage and to accord with Policy 5.13 of the London Plan.

11. No development shall take place until details of drainage works have been submitted to and approved in writing by the Local Planning Authority, and drainage works shall be carried out in accordance with the approved details prior to first use of any dwelling. Prior to the submission of those details, an assessment shall be carried out into the potential for disposing of surface water by means of a sustainable drainage system in accordance with the principles of sustainable drainage systems set out in Annex F of PPS25, and the results of the assessment provided to the Local Planning Authority. Where a sustainable drainage system scheme (SuDS) is to be implemented, the submitted details shall:

i) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and / or surface waters;

ii) specify the responsibilities of each party for the implementation of the SuDS scheme, together with a timetable for that implementation; and

iii) provide a management and maintenance plan for the lifetime of the development, which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.

The scheme shall be implemented, maintained and managed in accordance with the approved details.

REASON: To ensure satisfactory means of surface water drainage and to accord with Policy 5.13 of the London Plan.

12. Before commencement of the use of the land or building hereby permitted parking spaces and/or garages and turning space shall be completed in accordance with the approved details and thereafter shall be kept available for such use and no permitted development whether permitted by the Town and Country Planning (General Permitted Development Order (England) 2015 (or any Order amending, revoking and re-enacting this Order) or not shall be carried out on the land or garages indicated or in such a position as to preclude vehicular access to  the said land or garages.

REASON: In order to comply with Policy T3 of the Unitary Development Plan and to avoid development without adequate parking or garage provision, which is likely to lead to parking inconvenient to other road users and would be detrimental to amenities and prejudicial to road safety.

13. Before any part of the development hereby permitted is first occupied, bicycle parking (including covered storage facilities where appropriate) shall be provided at the site in accordance with details to be submitted to and approved in writing by the Local Planning Authority, and the bicycle parking/storage facilities shall be permanently retained thereafter.

REASON: In order to comply with Policy T7 and Appendix II.7 of the Unitary Development Plan and in order to provide adequate bicycle parking facilities at the site in the interest of reducing reliance on private car transport.

14. Prior to the commencement of the development hereby permitted a Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority.  The Plan shall include measures of how construction traffic can access the site safely and how potential traffic conflicts can be minimised; the route construction traffic shall follow for arriving at and leaving the site and the hours of operation, but shall not be limited to these. The Construction Management Plan shall be implemented in accordance with the agreed timescale and details.

REASON: In order to comply with Policy T5, T6, T7, T15, T16 & T18 of the Unitary Development Plan and in the interest of the amenities of the adjacent properties.

15. Before the development hereby permitted is occupied arrangements shall be agreed in writing with the Local Planning Authority and be put in place to ensure that, with the exception of disabled persons, no resident of the development shall obtain a resident’s parking permit within any controlled parking zone which may be in force in the vicinity of the site at any time.

REASON: In order to comply with Policy T3 of the Unitary Development Plan and to avoid development without adequate parking or garage provision, which is likely to lead to parking inconvenient to other road users and would be detrimental to amenities and prejudicial to road safety.

16. The developer should provide information of City Car Club vehicles in London Borough of Bromley. The developer must also offer the first resident 2 years annual membership of City Car Club (or operator of the closest car club to the development). In the first year of the car club membership, the developer will also provide the first resident a minimum of 20 hours driving time per unit for the type of vehicle located closest to the development.

REASON:  In order to provide for the transport needs of the development and comply with Policies T3 and T18 of the Unitary Development Plan.

17. Details of the proposed slab levels of the building(s) and the existing site levels shall be submitted to and approved in writing by the Local Planning Authority before work commences and the development shall be completed strictly in accordance with the approved levels.

REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the visual and residential amenities of the area.

INFORMATIVE:  You are advised that this application may be liable for the payment of the Mayoral Community Infrastructure Levy under the Community Infrastructure Levy Regulations (2010) and the Planning Act 2008. The London Borough of Bromley is the Collecting Authority for the Mayor and this Levy is payable on the commencement of development (defined in Part 2, para 7 of the Community Infrastructure Levy Regulations (2010). It is the responsibility of the owner and /or person(s) who have a material interest in the relevant land to pay the Levy (defined under Part 2, para 4(2) of the Community Infrastructure Levy Regulations (2010). If you fail to follow the payment procedure, the collecting authority may impose surcharges on this liability, take enforcement action, serve a stop notice to prohibit further development on the site and/or take action to recover the debt. Further information about Community Infrastructure Levy can be found on attached information note and the Bromley website www.bromley.gov.uk/CIL.

 

Supporting documents: