Issue - decisions

Service Road to shops fronting Southborough Lane/The Fairway, Bromley - Proposed making-up under Private Street Works procedure

26/04/2013 - SERVICE ROAD TO SHOPS FRONTING SOUTHBOROUGH LANE/THE FAIRWAY BROMLEY- PROPOSED MAKING-UP UNDER PRIVATE STREET WORKS PROCEDURE

(1)  The layout for the footway in front of Nos. 187-211 Southborough Lane, as shown on drawing No. 11324-01-1, be approved.

 

(2)  The layout for the footway in front of Nos. 213a-239 Southborough Lane, as shown on drawing No. 11324-01-2, be approved.

 

(3)  A First Resolution under s.205(i) of the Highways Act 1980 be made in respect of the footways as follows:

 

  The Council do hereby declare that the footway in front of Nos. 187-239 Southborough Lane is not levelled, paved, metalled, flagged channelled and made good to its satisfaction and therefore resolves to execute street works therein, under the provisions of the Private Street Works Code, as set out in the Highways Act 1980.

 

  Schedule of Works

 

  Part 1 – From a point in line with the Western flank boundary of No. 187 Southborough Lane to the west, to the western boundary of the highway known as The Fairway to the east.

 

  Part 2 – From the eastern boundary of the highway known as The Fairway to the west, to a point in line with the eastern flank boundary of Nos. 237-239 Southborough Lane, to the east.